In a study performed by Simon Istgren and Gustav Sedvallson as a master thesis at Linköping University regarding vertical logistics The Brunkeberg System came out approximately 25-30 percent more efficient than the base case scenario using traditional construction methods.
The thesis was conducted with the Tellus Tower as subject of comparison with a base case, Alimak-case and The Brunkeberg System.
Link: Master thesis
